Priority 1: Stabilize at Outlet
Priority 2: WORK INPROGRESS. DAM BEENING REBUILT FOR THE SECOUND TIME. SEE PIC..
Loading stormwater records…
STORMWATER FACILITY
501 N. MAIN ST
Greenville County · South Carolina
Condition describes the latest dated source assessment available, not a verified present-day assessment.
| Date | Record | Condition / result | Repairs & notes | Evidence |
|---|---|---|---|---|
| Dec 21, 2015 | Inspection | Acceptable | Not recorded | Greenville County public stormwater BMP GIS |
| Dec 1, 2015 | InspectionGC Re-Inspection | Unacceptable | Priority 1: Stabilize at Outlet Priority 2: WORK INPROGRESS. DAM BEENING REBUILT FOR THE SECOUND TIME. SEE PIC.. | Greenville County public stormwater BMP GIS |
| Oct 29, 2015 | InspectionGC Re-Inspection | Unacceptable | Priority 1: Stabilize Slopes , Stabilize at Outlet Priority 2: NO WORK HAS BEEN DONE. WILL CALL OWNER. CALLED OWNER WORK SHOULD HAVE STARTED WENESDAY 10.28.2015 DELAYED BECAUSE OF HEAVY RAIN. WILL CHECK WITH HIM NEXTS WEEK. | Greenville County public stormwater BMP GIS |
| Aug 24, 2015 | InspectionGC Re-Inspection | Unacceptable | Priority 1: Stabilize Slopes , Repair Leaks/Seeps on Embankment , Stabilize Adjacent Areas , Repair Cracks/Slides on Embankment Priority 2: EROSION ON DAM. REPAIR TO DAM AND OUTFALL FALLED AGAIN. WILL CALL OWNER. Dam was repaired again and failed. Erosion on back side of dam and behind riser. Will call owner. Called owner the contractor will be back nexts week 08.31.2015 to repair the dam. | Greenville County public stormwater BMP GIS |
| Jul 27, 2015 | InspectionGC Re-Inspection | Unacceptable | Priority 1: Stabilize Slopes , Stabilize at Outlet , Remove Built Up Sediment , Repair Leaks/Seeps on Embankment Priority 2: MEET OWNER ON JOB SITE. WORK WAS COMPLETED BUT OUTFALL PIPE HAD SEPERATED AGAIN CAUSING EROSION ON BACK SIDE OF DAM AND BEHIND RISER. CALLED CONTRACTOR HE SAID HE WILL BE BACK OUT THERE TODAY. SEDIMENT STILL NOT REMOVED AT INLET PIPE. | Greenville County public stormwater BMP GIS |
| Jul 17, 2015 | InspectionGC Re-Inspection | Unacceptable | Priority 1: Repair Structural Damage to Riser , Repair Cracks/Slides on Embankment Priority 2: WORK IN PROGRESS. SEE PIC. | Greenville County public stormwater BMP GIS |
| Jun 24, 2015 | InspectionGC Re-Inspection | Unacceptable | Priority 1: Stabilize at Outlet Priority 2: NO CHANGE FROM PREVIOUS INSPECTION. WILL SEND NEXTS NOV. 06.25.2015 Meet with owner on jobsite. Talk about erosion behind riser. Possible pipe seperation, very sever and also talk about sediment removal at inlet pipe. Gave him a list of contractors. He sa | Greenville County public stormwater BMP GIS |
| Jun 2, 2015 | InspectionGC Initial Inspection | Unacceptable | Priority 1: Cut Back/Clean Up Overgrown Vegetation , Stabilize Slopes , Stabilize at Outlet , Remove Built Up Sediment Priority 2: REMOVE BUILT UP SEDIMENT AT INLET PIPE AND RISER ORFICE. SEVER EROSION AT RISER MAYBE A PIPE SEPERATION. REMOVE OVERGROWN VEG. AT OUTFALL PIPE AND BACK OF DAM. WILL SENT 1ST NOV. | Greenville County public stormwater BMP GIS |
| Jan 4, 2013 | InspectionRe-Inspection | Acceptable | Not recorded | Greenville County public stormwater BMP GIS |
| Jan 4, 2013 | InspectionGC Re-Inspection | Acceptable | Not recorded | Greenville County public stormwater BMP GIS |
| Nov 15, 2012 | InspectionPeriodic Inspection | Unacceptable | Priority 1: Clean Out Trash , Cut Back/Clean Up Overgrown Vegetation , Mow Grass , Clear Egress/Ingress Routes , Remove Large Woody Vegetation | Greenville County public stormwater BMP GIS |
Published inspection recommendations are shown with their dates. The database does not establish whether these repairs remain unresolved.
Priority 1: Stabilize at Outlet
Priority 2: WORK INPROGRESS. DAM BEENING REBUILT FOR THE SECOUND TIME. SEE PIC..
Priority 1: Stabilize Slopes , Stabilize at Outlet
Priority 2: NO WORK HAS BEEN DONE. WILL CALL OWNER. CALLED OWNER WORK SHOULD HAVE STARTED WENESDAY 10.28.2015 DELAYED BECAUSE OF HEAVY RAIN. WILL CHECK WITH HIM NEXTS WEEK.
Priority 1: Stabilize Slopes , Repair Leaks/Seeps on Embankment , Stabilize Adjacent Areas , Repair Cracks/Slides on Embankment
Priority 2: EROSION ON DAM. REPAIR TO DAM AND OUTFALL FALLED AGAIN. WILL CALL OWNER. Dam was repaired again and failed. Erosion on back side of dam and behind riser. Will call owner. Called owner the contractor will be back nexts week 08.31.2015 to repair the dam.
Priority 1: Stabilize Slopes , Stabilize at Outlet , Remove Built Up Sediment , Repair Leaks/Seeps on Embankment
Priority 2: MEET OWNER ON JOB SITE. WORK WAS COMPLETED BUT OUTFALL PIPE HAD SEPERATED AGAIN CAUSING EROSION ON BACK SIDE OF DAM AND BEHIND RISER. CALLED CONTRACTOR HE SAID HE WILL BE BACK OUT THERE TODAY. SEDIMENT STILL NOT REMOVED AT INLET PIPE.
Priority 1: Repair Structural Damage to Riser , Repair Cracks/Slides on Embankment
Priority 2: WORK IN PROGRESS. SEE PIC.
Priority 1: Stabilize at Outlet
Recorded condition: Source score: 100
Review supporting evidence →Recorded condition: Acceptable
Review supporting evidence →Recorded condition: Unacceptable · Repair recommendations recorded
Review supporting evidence →Recorded condition: Unacceptable · Repair recommendations recorded
Review supporting evidence →Recorded condition: Unacceptable · Repair recommendations recorded
Review supporting evidence →Recorded condition: Unacceptable · Repair recommendations recorded
Review supporting evidence →Recorded condition: Unacceptable · Repair recommendations recorded
Review supporting evidence →Recorded condition: Unacceptable · Repair recommendations recorded
Review supporting evidence →Recorded condition: Unacceptable · Repair recommendations recorded
Review supporting evidence →Recorded condition: Acceptable
Published values appear beside the database value. Retrieval time records when evidence was collected; it is not an inspection or source-update date.
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 1286 | 1286 |
| Legacy Asset Id | 1588 | 1588 |
| Parcel Id | M008010100301 | M008010100301 |
| Address | 501 N. MAIN ST | 501 N. MAIN ST |
| Source facility type | Dry Detention Pond | Dry Detention Pond |
| Site Name | Ironclad Properties LLC | Ironclad Properties LLC |
| Responsible party | Ironclad Properties LLC | Ironclad Properties LLC |
| Source owner category | Private | Private |
| Condition Date | 2026-01-05T15:08:35.000Z | 1767625715000 |
| Source condition score | 100 | 100 |
| Operational Status | In Service | In Service |
Priority 2: NO CHANGE FROM PREVIOUS INSPECTION. WILL SEND NEXTS NOV. 06.25.2015 Meet with owner on jobsite. Talk about erosion behind riser. Possible pipe seperation, very sever and also talk about sediment removal at inlet pipe. Gave him a list of contractors. He sa
Priority 1: Cut Back/Clean Up Overgrown Vegetation , Stabilize Slopes , Stabilize at Outlet , Remove Built Up Sediment
Priority 2: REMOVE BUILT UP SEDIMENT AT INLET PIPE AND RISER ORFICE. SEVER EROSION AT RISER MAYBE A PIPE SEPERATION. REMOVE OVERGROWN VEG. AT OUTFALL PIPE AND BACK OF DAM. WILL SENT 1ST NOV.
Priority 1: Clean Out Trash , Cut Back/Clean Up Overgrown Vegetation , Mow Grass , Clear Egress/Ingress Routes , Remove Large Woody Vegetation
Recorded condition: Acceptable
Review supporting evidence →Recorded condition: Unacceptable · Repair recommendations recorded
Review supporting evidence →| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 1242 | 1242 |
| Legacy Asset Id | 1588 | 1588 |
| Source facility type | Dry Detention Pond | Dry Detention Pond |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 1815 | 1815 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2012-11-15T11:18:09.000Z | 1352978289000 |
| Inspection Type | Periodic Inspection | Periodic Inspection |
| Overall condition | Unacceptable | Unacceptable |
| Priority 1 repair recommendations | Clean Out Trash , Cut Back/Clean Up Overgrown Vegetation , Mow Grass , Clear Egress/Ingress Routes , Remove Large Woody Vegetation | Clean Out Trash , Cut Back/Clean Up Overgrown Vegetation , Mow Grass , Clear Egress/Ingress Routes , Remove Large Woody Vegetation |
| Vegetation Condition | No | No |
| Trash Condition | No | No |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 2667 | 2667 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2013-01-04T14:23:38.000Z | 1357309418000 |
| Inspection Type | Re-Inspection | Re-Inspection |
| Overall condition | Acceptable | Acceptable |
| Last Cleaned | 2013-01-04T14:23:50.000Z | 1357309430000 |
| Vegetation Condition | Yes | Yes |
| Sediment Condition | Yes | Yes |
| Trash Condition | Yes | Yes |
| Outlet Condition | Yes | Yes |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 2933 | 2933 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2013-01-04T09:33:43.000Z | 1357292023000 |
| Inspection Type | GC Re-Inspection | GC Re-Inspection |
| Overall condition | Acceptable | Acceptable |
| Vegetation Condition | Yes | Yes |
| Sediment Condition | Yes | Yes |
| Trash Condition | Yes | Yes |
| Outlet Condition | Yes | Yes |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 2967 | 2967 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2015-06-24T11:26:08.000Z | 1435145168000 |
| Inspection Type | GC Re-Inspection | GC Re-Inspection |
| Overall condition | Unacceptable | Unacceptable |
| Priority 1 repair recommendations | Stabilize at Outlet | Stabilize at Outlet |
| Priority 2 repair recommendations | NO CHANGE FROM PREVIOUS INSPECTION. WILL SEND NEXTS NOV. 06.25.2015 Meet with owner on jobsite. Talk about erosion behind riser. Possible pipe seperation, very sever and also talk about sediment removal at inlet pipe. Gave him a list of contractors. He sa | NO CHANGE FROM PREVIOUS INSPECTION. WILL SEND NEXTS NOV. 06.25.2015 Meet with owner on jobsite. Talk about erosion behind riser. Possible pipe seperation, very sever and also talk about sediment removal at inlet pipe. Gave him a list of contractors. He sa |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 3227 | 3227 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2015-07-27T14:54:05.000Z | 1438008845000 |
| Inspection Type | GC Re-Inspection | GC Re-Inspection |
| Overall condition | Unacceptable | Unacceptable |
| Priority 1 repair recommendations | Stabilize Slopes , Stabilize at Outlet , Remove Built Up Sediment , Repair Leaks/Seeps on Embankment | Stabilize Slopes , Stabilize at Outlet , Remove Built Up Sediment , Repair Leaks/Seeps on Embankment |
| Priority 2 repair recommendations | MEET OWNER ON JOB SITE. WORK WAS COMPLETED BUT OUTFALL PIPE HAD SEPERATED AGAIN CAUSING EROSION ON BACK SIDE OF DAM AND BEHIND RISER. CALLED CONTRACTOR HE SAID HE WILL BE BACK OUT THERE TODAY. SEDIMENT STILL NOT REMOVED AT INLET PIPE. | MEET OWNER ON JOB SITE. WORK WAS COMPLETED BUT OUTFALL PIPE HAD SEPERATED AGAIN CAUSING EROSION ON BACK SIDE OF DAM AND BEHIND RISER. CALLED CONTRACTOR HE SAID HE WILL BE BACK OUT THERE TODAY. SEDIMENT STILL NOT REMOVED AT INLET PIPE. |
| Vegetation Condition | No | No |
| Trash Condition | Yes | Yes |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 5123 | 5123 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2015-07-17T09:58:07.000Z | 1437127087000 |
| Inspection Type | GC Re-Inspection | GC Re-Inspection |
| Overall condition | Unacceptable | Unacceptable |
| Priority 1 repair recommendations | Repair Structural Damage to Riser , Repair Cracks/Slides on Embankment | Repair Structural Damage to Riser , Repair Cracks/Slides on Embankment |
| Priority 2 repair recommendations | WORK IN PROGRESS. SEE PIC. | WORK IN PROGRESS. SEE PIC. |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 5570 | 5570 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2015-06-02T14:57:27.000Z | 1433257047000 |
| Inspection Type | GC Initial Inspection | GC Initial Inspection |
| Overall condition | Unacceptable | Unacceptable |
| Priority 1 repair recommendations | Cut Back/Clean Up Overgrown Vegetation , Stabilize Slopes , Stabilize at Outlet , Remove Built Up Sediment | Cut Back/Clean Up Overgrown Vegetation , Stabilize Slopes , Stabilize at Outlet , Remove Built Up Sediment |
| Priority 2 repair recommendations | REMOVE BUILT UP SEDIMENT AT INLET PIPE AND RISER ORFICE. SEVER EROSION AT RISER MAYBE A PIPE SEPERATION. REMOVE OVERGROWN VEG. AT OUTFALL PIPE AND BACK OF DAM. WILL SENT 1ST NOV. | REMOVE BUILT UP SEDIMENT AT INLET PIPE AND RISER ORFICE. SEVER EROSION AT RISER MAYBE A PIPE SEPERATION. REMOVE OVERGROWN VEG. AT OUTFALL PIPE AND BACK OF DAM. WILL SENT 1ST NOV. |
| Vegetation Condition | No | No |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 5722 | 5722 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2015-08-24T11:51:56.000Z | 1440417116000 |
| Inspection Type | GC Re-Inspection | GC Re-Inspection |
| Overall condition | Unacceptable | Unacceptable |
| Priority 1 repair recommendations | Stabilize Slopes , Repair Leaks/Seeps on Embankment , Stabilize Adjacent Areas , Repair Cracks/Slides on Embankment | Stabilize Slopes , Repair Leaks/Seeps on Embankment , Stabilize Adjacent Areas , Repair Cracks/Slides on Embankment |
| Priority 2 repair recommendations | EROSION ON DAM. REPAIR TO DAM AND OUTFALL FALLED AGAIN. WILL CALL OWNER. Dam was repaired again and failed. Erosion on back side of dam and behind riser. Will call owner. Called owner the contractor will be back nexts week 08.31.2015 to repair the dam. | EROSION ON DAM. REPAIR TO DAM AND OUTFALL FALLED AGAIN. WILL CALL OWNER. Dam was repaired again and failed. Erosion on back side of dam and behind riser. Will call owner. Called owner the contractor will be back nexts week 08.31.2015 to repair the dam. |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 5887 | 5887 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2015-10-29T15:01:23.000Z | 1446130883000 |
| Inspection Type | GC Re-Inspection | GC Re-Inspection |
| Overall condition | Unacceptable | Unacceptable |
| Priority 1 repair recommendations | Stabilize Slopes , Stabilize at Outlet | Stabilize Slopes , Stabilize at Outlet |
| Priority 2 repair recommendations | NO WORK HAS BEEN DONE. WILL CALL OWNER. CALLED OWNER WORK SHOULD HAVE STARTED WENESDAY 10.28.2015 DELAYED BECAUSE OF HEAVY RAIN. WILL CHECK WITH HIM NEXTS WEEK. | NO WORK HAS BEEN DONE. WILL CALL OWNER. CALLED OWNER WORK SHOULD HAVE STARTED WENESDAY 10.28.2015 DELAYED BECAUSE OF HEAVY RAIN. WILL CHECK WITH HIM NEXTS WEEK. |
| Vegetation Condition | Yes | Yes |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 6024 | 6024 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2015-12-01T13:34:38.000Z | 1448976878000 |
| Inspection Type | GC Re-Inspection | GC Re-Inspection |
| Overall condition | Unacceptable | Unacceptable |
| Priority 1 repair recommendations | Stabilize at Outlet | Stabilize at Outlet |
| Priority 2 repair recommendations | WORK INPROGRESS. DAM BEENING REBUILT FOR THE SECOUND TIME. SEE PIC.. | WORK INPROGRESS. DAM BEENING REBUILT FOR THE SECOUND TIME. SEE PIC.. |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 6059 | 6059 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2015-12-21T10:06:37.000Z | 1450692397000 |
| Overall condition | Acceptable | Acceptable |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 1815 | 1815 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2012-11-15T11:18:09.000Z | 1352978289000 |
| Inspection Type | Periodic Inspection | Periodic Inspection |
| Overall condition | Unacceptable | Unacceptable |
| Priority 1 repair recommendations | Clean Out Trash , Cut Back/Clean Up Overgrown Vegetation , Mow Grass , Clear Egress/Ingress Routes , Remove Large Woody Vegetation | Clean Out Trash , Cut Back/Clean Up Overgrown Vegetation , Mow Grass , Clear Egress/Ingress Routes , Remove Large Woody Vegetation |
| Vegetation Condition | No | No |
| Trash Condition | No | No |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 2667 | 2667 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2013-01-04T14:23:38.000Z | 1357309418000 |
| Inspection Type | Re-Inspection | Re-Inspection |
| Overall condition | Acceptable | Acceptable |
| Last Cleaned | 2013-01-04T14:23:50.000Z | 1357309430000 |
| Vegetation Condition | Yes | Yes |
| Sediment Condition | Yes | Yes |
| Trash Condition | Yes | Yes |
| Outlet Condition | Yes | Yes |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 2933 | 2933 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2013-01-04T09:33:43.000Z | 1357292023000 |
| Inspection Type | GC Re-Inspection | GC Re-Inspection |
| Overall condition | Acceptable | Acceptable |
| Vegetation Condition | Yes | Yes |
| Sediment Condition | Yes | Yes |
| Trash Condition | Yes | Yes |
| Outlet Condition | Yes | Yes |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 2967 | 2967 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2015-06-24T11:26:08.000Z | 1435145168000 |
| Inspection Type | GC Re-Inspection | GC Re-Inspection |
| Overall condition | Unacceptable | Unacceptable |
| Priority 1 repair recommendations | Stabilize at Outlet | Stabilize at Outlet |
| Priority 2 repair recommendations | NO CHANGE FROM PREVIOUS INSPECTION. WILL SEND NEXTS NOV. 06.25.2015 Meet with owner on jobsite. Talk about erosion behind riser. Possible pipe seperation, very sever and also talk about sediment removal at inlet pipe. Gave him a list of contractors. He sa | NO CHANGE FROM PREVIOUS INSPECTION. WILL SEND NEXTS NOV. 06.25.2015 Meet with owner on jobsite. Talk about erosion behind riser. Possible pipe seperation, very sever and also talk about sediment removal at inlet pipe. Gave him a list of contractors. He sa |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 3227 | 3227 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2015-07-27T14:54:05.000Z | 1438008845000 |
| Inspection Type | GC Re-Inspection | GC Re-Inspection |
| Overall condition | Unacceptable | Unacceptable |
| Priority 1 repair recommendations | Stabilize Slopes , Stabilize at Outlet , Remove Built Up Sediment , Repair Leaks/Seeps on Embankment | Stabilize Slopes , Stabilize at Outlet , Remove Built Up Sediment , Repair Leaks/Seeps on Embankment |
| Priority 2 repair recommendations | MEET OWNER ON JOB SITE. WORK WAS COMPLETED BUT OUTFALL PIPE HAD SEPERATED AGAIN CAUSING EROSION ON BACK SIDE OF DAM AND BEHIND RISER. CALLED CONTRACTOR HE SAID HE WILL BE BACK OUT THERE TODAY. SEDIMENT STILL NOT REMOVED AT INLET PIPE. | MEET OWNER ON JOB SITE. WORK WAS COMPLETED BUT OUTFALL PIPE HAD SEPERATED AGAIN CAUSING EROSION ON BACK SIDE OF DAM AND BEHIND RISER. CALLED CONTRACTOR HE SAID HE WILL BE BACK OUT THERE TODAY. SEDIMENT STILL NOT REMOVED AT INLET PIPE. |
| Vegetation Condition | No | No |
| Trash Condition | Yes | Yes |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 5123 | 5123 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2015-07-17T09:58:07.000Z | 1437127087000 |
| Inspection Type | GC Re-Inspection | GC Re-Inspection |
| Overall condition | Unacceptable | Unacceptable |
| Priority 1 repair recommendations | Repair Structural Damage to Riser , Repair Cracks/Slides on Embankment | Repair Structural Damage to Riser , Repair Cracks/Slides on Embankment |
| Priority 2 repair recommendations | WORK IN PROGRESS. SEE PIC. | WORK IN PROGRESS. SEE PIC. |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 5570 | 5570 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2015-06-02T14:57:27.000Z | 1433257047000 |
| Inspection Type | GC Initial Inspection | GC Initial Inspection |
| Overall condition | Unacceptable | Unacceptable |
| Priority 1 repair recommendations | Cut Back/Clean Up Overgrown Vegetation , Stabilize Slopes , Stabilize at Outlet , Remove Built Up Sediment | Cut Back/Clean Up Overgrown Vegetation , Stabilize Slopes , Stabilize at Outlet , Remove Built Up Sediment |
| Priority 2 repair recommendations | REMOVE BUILT UP SEDIMENT AT INLET PIPE AND RISER ORFICE. SEVER EROSION AT RISER MAYBE A PIPE SEPERATION. REMOVE OVERGROWN VEG. AT OUTFALL PIPE AND BACK OF DAM. WILL SENT 1ST NOV. | REMOVE BUILT UP SEDIMENT AT INLET PIPE AND RISER ORFICE. SEVER EROSION AT RISER MAYBE A PIPE SEPERATION. REMOVE OVERGROWN VEG. AT OUTFALL PIPE AND BACK OF DAM. WILL SENT 1ST NOV. |
| Vegetation Condition | No | No |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 5722 | 5722 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2015-08-24T11:51:56.000Z | 1440417116000 |
| Inspection Type | GC Re-Inspection | GC Re-Inspection |
| Overall condition | Unacceptable | Unacceptable |
| Priority 1 repair recommendations | Stabilize Slopes , Repair Leaks/Seeps on Embankment , Stabilize Adjacent Areas , Repair Cracks/Slides on Embankment | Stabilize Slopes , Repair Leaks/Seeps on Embankment , Stabilize Adjacent Areas , Repair Cracks/Slides on Embankment |
| Priority 2 repair recommendations | EROSION ON DAM. REPAIR TO DAM AND OUTFALL FALLED AGAIN. WILL CALL OWNER. Dam was repaired again and failed. Erosion on back side of dam and behind riser. Will call owner. Called owner the contractor will be back nexts week 08.31.2015 to repair the dam. | EROSION ON DAM. REPAIR TO DAM AND OUTFALL FALLED AGAIN. WILL CALL OWNER. Dam was repaired again and failed. Erosion on back side of dam and behind riser. Will call owner. Called owner the contractor will be back nexts week 08.31.2015 to repair the dam. |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 5887 | 5887 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2015-10-29T15:01:23.000Z | 1446130883000 |
| Inspection Type | GC Re-Inspection | GC Re-Inspection |
| Overall condition | Unacceptable | Unacceptable |
| Priority 1 repair recommendations | Stabilize Slopes , Stabilize at Outlet | Stabilize Slopes , Stabilize at Outlet |
| Priority 2 repair recommendations | NO WORK HAS BEEN DONE. WILL CALL OWNER. CALLED OWNER WORK SHOULD HAVE STARTED WENESDAY 10.28.2015 DELAYED BECAUSE OF HEAVY RAIN. WILL CHECK WITH HIM NEXTS WEEK. | NO WORK HAS BEEN DONE. WILL CALL OWNER. CALLED OWNER WORK SHOULD HAVE STARTED WENESDAY 10.28.2015 DELAYED BECAUSE OF HEAVY RAIN. WILL CHECK WITH HIM NEXTS WEEK. |
| Vegetation Condition | Yes | Yes |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 6024 | 6024 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2015-12-01T13:34:38.000Z | 1448976878000 |
| Inspection Type | GC Re-Inspection | GC Re-Inspection |
| Overall condition | Unacceptable | Unacceptable |
| Priority 1 repair recommendations | Stabilize at Outlet | Stabilize at Outlet |
| Priority 2 repair recommendations | WORK INPROGRESS. DAM BEENING REBUILT FOR THE SECOUND TIME. SEE PIC.. | WORK INPROGRESS. DAM BEENING REBUILT FOR THE SECOUND TIME. SEE PIC.. |
| Fact | Database value | Original source value |
|---|---|---|
| Bmp Id | LAUR-1588 | LAUR-1588 |
| Source Record Id | 6059 | 6059 |
| Legacy Asset Id | 1588 | 1588 |
| Inspection date | 2015-12-21T10:06:37.000Z | 1450692397000 |
| Overall condition | Acceptable | Acceptable |